
Tile Replacement
When a tile floor is dated, damaged across the field, or stuck in 1994, replacement is the honest path. It is dusty, loud, structural work, and doing it cleanly is a service in itself.
Out with the old floor, properly
Tile demolition is the part of this trade nobody romanticizes: breaking out the old field, grinding the mortar bed flat, and hauling shocking amounts of debris, all while keeping the dust from annexing your home. We contain the work zone, run dust extraction on the grinders, and protect the paths in and out. The difference between a professional demo and a sledgehammer weekend shows up in your air vents for months.
What demolition reveals is the real value: the substrate’s actual condition. Old floors hide cracked slabs, rotted subfloor around long-gone leaks, and heights that never matched the adjacent rooms. All of it is fixable at its cheapest possible moment, before the new floor goes down. Then the new tile gets set with the full prep stack: backer or membrane, flat mortar, level field, correct joints.
What the job includes
- Contained demolition with dust extraction on all grinding
- Complete debris haul-off, no driveway surprises
- Substrate repair: subfloor, slab patching, height corrections
- Fresh backer board or uncoupling membrane as the room requires
- New tile installation to our full setting standard
- Transitions re-worked so adjacent floors meet cleanly
How the job runs
The walkthrough
We look at the substrate, talk layout and grout lines, and flag anything that needs correcting underneath. You get a straight price in writing.
Substrate prep
Cement board or membrane where it belongs, flat and fastened to spec. Tile is only as good as what it sits on.
Setting and grouting
Tiles set level with consistent joints, cuts kept tight at edges and penetrations, grout worked clean and sealed once cured.
The walkoff
Joint lines checked with you, haze buffed off, leftover tile boxed and labeled for future repairs.
What replacement jobs teach, at your expense or ours
The classic replacement surprise is height: old mud-set tile floors often sit tall, and removing them drops the floor enough that doorways, appliances, and toilet flanges all need adjusting. We measure and warn about all of it during the quote visit, because discovering it mid-job is how other crews generate change orders. Our written price includes the transitions and adjustments we can see coming.
Second lesson: do not set new tile over an old cracked slab without an uncoupling membrane. The crack always wins eventually, telegraphing up through fresh porcelain within a couple of seasons. The membrane is cheap insurance we consider non-negotiable over cracked slabs, and we will show you the crack that makes it necessary.
Why people call us instead of the big outfits
Hardwood Kings is Thiago Reis and his crew, not a call center with subcontractors. The person who looks at your floor is the person responsible for how it turns out, and the company’s whole reputation, fourteen years of it, rides on every job. We are licensed, certified, and insured, our Google rating sits at 5.0, and most new work comes from referrals and repeat customers. That is what treating clients like family earns, and it is the only marketing we have ever really trusted.
Materials we stand behind
Tile and setting materials come through ProSource Wholesale and trade suppliers at contractor pricing: porcelain and ceramic from manufacturers whose sizing runs true, natural stone sorted by hand, and the mortars, membranes, and grouts that the tile industry’s standards actually call for. The pretty part of the floor is a fraction of what goes into it staying pretty.
We will also talk you through grout chemistry, cementitious versus epoxy, sealed versus not, because grout is the part of a tile floor you live with daily. Epoxy costs more on install day and never asks for attention again; cement grout is economical and wants sealing on a schedule. Both are right answers in the right rooms, and we quote them side by side.
Where we do this work
Tile replacement projects run through Lenexa and Olathe kitchens stuck in past decades, and Kansas City, MO baths ready for this one.
Our shop sits in Shawnee and the working radius runs fifty miles in every direction, which covers Johnson, Wyandotte, and Jackson counties and everything between. If you are anywhere in the KC metro and need tile replacement handled by people who do it every week, you are inside the circle.
Related work: Tile Installation·Tile Repair·LVT alternative
Questions about this work
Real questions from real phone calls. If yours is not here, ask it the direct way and talk to the people who do the work.
Need more help?
Thiago answers flooring questions all day and enjoys it.
(913) 915-3193hardwoodkingsinc@gmail.comHow messy is tile removal really?
It is the dustiest job in flooring, which is why containment and extraction are not optional with us. Expect noise and activity for a day or two, and expect your house to stay livable throughout. That second part is the professional difference.
Can new tile go over the old tile instead?
Sometimes, when the old floor is flat, sound, and the added height will not wreck doorways and appliances. It saves demo cost where conditions allow. We assess honestly, because the wrong candidates for over-tiling fail expensively.
Will my floor height change after replacement?
Often slightly, especially replacing old thick mortar-bed floors. We plan transitions, appliance clearances, and door undercuts as part of the quote so nothing surprises you at the doorway.
How long does full tile replacement take?
Demo, substrate work, setting, and grout typically run four to six working days for a kitchen or large bath. Cure stages set the pace and we do not cheat them. Dates come in writing.
Could I switch from tile to another floor entirely?
Absolutely, replacement is the natural moment to change materials. Plenty of clients go from cold 90s tile to LVT or hardwood. Once demo is done, the substrate can carry whatever suits the room best.
How do I get a price for tile replacement?
Call (913) 915-3193 or send the contact form with a rough description of the rooms and what is on the floor now. Thiago comes out, looks at the actual conditions, measures, and hands you a straight price in writing, usually within a few days of your call. No pressure follows it, and the number does not mutate once work starts.

Ready to talk about your floors?
Call, describe the floor, and Thiago will come see it himself. You get a straight price in writing and honest advice either way.
Or see finished work first. Family-run in Shawnee since 2012, licensed and certified, and rated 5.0 by the KC metro customers who already made the call.